Dog & Co 6 In 1 Sports Training Lead Orange 1" X 72" Hem & Boo
![]() Click to enlarge |
Qty:
|
Overview
6 in 1 sports training lead
Ideal for walks in the park or more serious dog training.
This lead can be used at a choice of three lengths: short - 93cm, medium - 115cm or long - 160cm.
The lead can also be used to walk two dogs, hands free and used as a tether at any of the 3 lengths.
Metal trigger hooks and rings in black.
Reflective for dadded safety